The economics of structured selection: a utility model, its assumptions and how to use it honestly
What is a better hiring process worth? A walk through the Brogden–Cronbach–Gleser utility model with a computed example, a sensitivity table that shows how fragile the headline number is, and advice on using the model to prioritise rather than to promise.
September 8, 2026

Key takeaways
- The utility model says the gain from selection grows with how many you hire, how long they stay, how much better the new method predicts and how much people differ in value.
- In the worked example, moving validity from 0.20 to 0.35 for 20 hires is worth about €252,000 before costs. Under pessimistic assumptions the same change is worth about €70,000.
- The largest uncertainty is the value of differences in performance (SDy). Report a range and show your assumptions.
- Use the model to rank options and to decide where a better process is worth the effort. Do not present one number as a forecast.
In this article
Every proposal to improve hiring eventually meets the question, “what is it worth?”. Selection researchers have a standard way to answer it, utility analysis, and a long record of both using it and arguing about it. This paper explains the model, runs a worked example with its arithmetic, shows how sensitive the answer is and offers a way to use it that survives scrutiny from a sceptical finance director.
1. The model
The Brogden–Cronbach–Gleser model, developed in the 1940s and 1950s and extended by Schmidt, Hunter and colleagues, estimates the gain in value from using a selection method instead of selecting at random, or instead of another method. In its common form:
Gain = Ns × T × (r_new − r_old) × SDy × Zx − Cost
Ns number of people hired
T average time they stay in the job, in years
r validity: correlation between the method's scores and job performance
SDy standard deviation of job performance in money terms per year
Zx average standardised score of those selected (depends on the selection ratio)
Cost extra cost of the new methodIn words: the more people you hire, the longer they stay, the better your method predicts performance, the more performance varies in value between people, and the more selective you can be, the larger the gain. Remove any one of those and the gain shrinks.
2. The inputs, one at a time
| Input | What it is | Typical source | How certain it is |
|---|---|---|---|
| Ns | Hires per year in the role | Your HR records | High |
| T | Average tenure of hires | Your HR records, or a conservative 2 to 3 years | Medium |
| r_new − r_old | Improvement in validity | Meta-analyses (for example Sackett et al., 2022) or your own validation | Low to medium: published estimates differ and your use may differ |
| SDy | Spread in the yearly value of performance | Often estimated as 40% of annual salary (the “40% rule”), or by supervisor estimates | Low: this is the most debated input |
| Zx | How far above average the selected people score | Computed from the selection ratio: 1.40 if you hire 1 in 5, 0.80 if you hire 1 in 2 | High if the selection ratio is known |
| Cost | Extra cost of the better method | Tool fees, interviewer hours, candidate time you pay for | High |
The standardised score is computed from the normal distribution. Selecting the top 20% means selecting everyone above a z-score of 0.84. The average z-score of that group is the height of the normal curve at that point (0.28) divided by the selection ratio (0.20), which gives 1.40. For a selection ratio of 0.50, it is 0.80.
3. A worked example
Assume a company hires 20 people a year into a role with an annual salary of €50,000. The new process, a structured interview plus a work sample, is estimated to raise validity from 0.20 (the old, mostly unstructured process) to 0.35. The company hires about one in five applicants, so 100 candidates enter the process. The extra cost is €150 per applicant, for the assessment and the interviewers’ time. Hires stay three years on average. SDy is taken as 40% of salary, €20,000. All of these inputs are invented for the illustration.
- Zx for a selection ratio of 0.20 is 1.40.
- Gross gain = 20 × 3 × (0.35 − 0.20) × €20,000 × 1.40 = 20 × 3 × 0.15 × 20,000 × 1.40 ≈ €252,000.
- Extra cost = 100 applicants × €150 = €15,000.
- Net gain ≈ €252,000 − €15,000 = €237,000.
On those inputs, the better process returns about sixteen times what it costs. That looks wonderful, and it should make you suspicious, for reasons in the next section.
4. How fragile is the number?
Change the assumptions one at a time and look at what happens. All figures are computed from the same equation.
| Scenario | Change | Gross gain | Net of €15,000 cost |
|---|---|---|---|
| Base case | As above | €252,000 | €237,000 |
| Lower SDy | SDy = 25% of salary (€12,500) | €157,000 | €142,000 |
| Smaller validity gain | Improvement 0.10, not 0.15 | €168,000 | €153,000 |
| Shorter tenure | Two years, not three | €168,000 | €153,000 |
| Pessimistic | SDy €12,500, improvement 0.10, tenure two years | €70,000 | €55,000 |
The pessimistic case is about a quarter of the base case, and it still clears its costs comfortably. That is the useful message: the investment is attractive under a wide range of assumptions, even though the precise number is not knowable. A single figure of €237,000 invites argument. A range of €55,000 to €237,000 invites a decision.
5. Why the model is argued about
- SDy is hard to know. Supervisor estimates of the value of performance vary widely, and some critics think they are inflated. The 40% rule is a convention, not a measurement.
- It ignores some costs and discounting. Gains arrive over several years; the model in its basic form does not discount them, and does not subtract taxes or the cost of mistakes in the new process.
- Validity is an average. A validity of 0.35 from a meta-analysis may not hold in your setting, with your raters and your applicants.
- Managers distrust the big numbers. Research on how managers react to utility estimates has found that very large figures can reduce rather than raise confidence. Present ranges and plain assumptions.
6. Using it honestly
- Estimate with rangesChoose a low, middle and high value for SDy, validity gain and tenure. Report the low and the middle.
- Show the arithmeticPut the equation and every input on one page. People trust numbers they can recompute.
- Count costs fullyInclude candidate time you pay for, interviewer hours at their real cost, tool fees and the time to train interviewers.
- Compare options, not just ‘better or not’The model is good at ranking: is it worth more to improve screening for the 200-hire contact centre role, or for the 5-hire engineering role? Where Ns and T are large, a small validity gain is worth a lot.
- Check it with your own dataOnce you have a year of results, compare actual performance ratings of hires with the model’s forecast, and update. See the guide on running a local validation pilot.
Use it to prioritise, not to promise
Telling the board that a new process will deliver €237,000 sets an expectation no one can meet. Telling them that it is likely worth at least €55,000 on conservative assumptions, and showing how you will check, is a claim you can keep.
7. What the model leaves out
The utility model counts the value of better performance. It does not count other things that matter: fairness to candidates, the experience of the process, legal risk and the cost of a bad hire’s effect on a team. Those are real and sometimes larger. They are best handled alongside the model, not inside it. A process that is both more predictive and fairer is worth more than the equation shows.
8. A second worked example: replacing a screening interview
The first example was a skilled role with a selective process. Here is a high-volume case. A contact centre hires 100 agents a year at an annual salary of €30,000. It replaces an unstructured phone screen with a 30-minute structured assessment, and expects validity to rise from 0.20 to 0.30. It hires one in two of those who reach this stage (a selection ratio of 0.50, so Zx = 0.80). Agents stay 1.5 years on average. SDy is 40% of salary, €12,000. The extra cost is €40 per applicant, and 200 applicants enter the stage. All inputs are invented.
- Gross gain = 100 × 1.5 × (0.30 − 0.20) × €12,000 × 0.80 = 100 × 1.5 × 0.10 × 12,000 × 0.80 ≈ €144,000.
- Extra cost = 200 × €40 = €8,000. Net ≈ €136,000.
- Pessimistic case: SDy 25% of salary (€7,500), validity gain 0.06, tenure one year: 100 × 1 × 0.06 × 7,500 × 0.80 = €36,000 gross, about €28,000 net.
Even the pessimistic case clears its cost three times over. In high-volume roles, a small validity gain applied to many hires is worth a lot, which is why such roles are the natural place to start improving a process.
9. What to put in a business case
- The decision and the options. What you are choosing between, including doing nothing.
- The inputs, with sources. Hires per year, tenure, salary, selection ratio and validity, each with where it came from.
- A range, not a point. Low, middle and high values for the uncertain inputs, and the resulting net gain for each.
- The costs in full. Tools, interviewer time, training, candidate time you pay for and the effort to change the process.
- Non-financial effects. Candidate experience, fairness and legal risk, described in words and, where you can, in measures.
- How you will check. The measures, the dates and who will report, so that you can say later whether it worked.
About the author
Jonas Brandt, Organisational psychologist
Jonas works on how to choose people on evidence: success profiles, structured interviews and checking whether a hiring method really predicts good work. He writes about selection methods and how to measure hiring quality honestly.